Keystone Solar Project                                          
 
Location:
Lancaster, PA
 
Installation:
10 AE 500NX Inverters
6 MW
 
Date Installed:
October 2012
TESTIMONIAL
 “Design modifications and an aggressive construction schedule posed challenges to bring this 6MW project to commercial operation on a timely basis.  Advanced Energy was a flexible and responsive partner during the entire process.”
  -Jamie Resor, CEO
    groSolar
 