Borrego Solar

Stone Brewing Co., Escondido, CA

(1) AE 75TX 480v for a 312kW solar photovoltaic system

Date Installed:
June 13, 2008



“The AE Solar Energy team proved to be very responsive during the sales and design phase of our project. They truly took ownership of their product and its role in the installation. The inverter is well designed with real world installation issues accounted for and has operated without fault since being commissioned.”

– Max Sugihara, Sr. Project Manager, Borrego Solar Systems